US ARMY SIGNAL CENTER AND FORT GORDON
FORT GORDON, GEORGIA 30905-5070
END-OF-SUBCOURSE PRACTICE EXERCISE
PERFORMANCE (HANDS-ON/WITH THE EQUIPMENT)
Date: 30
September 1989
SUBCOURSE NO./TITLE:
SS 0396-9, Troubleshoot/Repair
AN/UXC-7
at
Unit Level (29J)
TERMINAL LEARNING OBJECTIVE
(PERFORMANCE: HANDS-ON W/EQUIPMENT):
TASK:
Troubleshoot/repair AN/UXC-7 at unit level.
CONDITIONS:
Given an AN/UXC-7 with unit level fault, TMDE,
tools, AC or 28 V DC power source, and
references.
STANDARDS:
Acceptable performance is demonstrated by
correctly performing each step within a time
limit of 15 minutes for each step, within one
out of two attempts.
INSTRUCTIONS:
When you feel you are ready to perform the performance (hands-on
w/equipment) end-of-subcourse practice exercise for this subcourse,
inform your SOJT monitor. You are reminded not to attempt to perform the
above task without the assistance of an assigned SOJT monitor.
1ST ATTEMPT
2D ATTEMPT
SOJT
SOJT
NO- MONITOR'S
NO- MONITOR'S
GO
GO
INITIALS
GO
GO
INITIALS
1. Perform diagnostic
test and note errors
that occur.
___
___
_________ ____ ____
_______
2. Operate LDF IAW
TM 11-5815-615-10.
3. Troubleshoot error
___
___
_________ ____ ____
_______
found during operation
or test.
___
___
_________ ____ ____
_______
4. Repair fault found
during troubleshooting.
___
___
_________ ____ ____
_______
27