(c)
Action to be taken on finding ordnance:
(1)
Stop line.
(2)
EOD inspects ordnance. If it is free of explosive, place it on scrap truck. If it is too
hazardous to move, place a stake for later destruction.
(d)
When required, scrap truck takes scrap to collection point.
(e)
At completion of staking operation, the section leader marks boundaries of the area
staked by the section.
(f)
At the end of the day, all non-EOD personnel leave the range. The section leader
accounts for all personnel.
(g)
EOD remains to dispose of all staked ordnance.
2. EOD personnel at Collection Point.
(a)
Inspect all incoming scrap for explosive components.
(b)
Remove all explosive components and take them to the range for disposal.
45