Figure 53. Placement and priming of an M10 universal destructor.
Figure 54. Attaching a blasting cap to the detonating cord system using an M1 detonating cord clip.
Figure 55. Attaching a blasting cap to the detonating cord system using a detonating cord connector.
35
MM0165