After the demolition charges have been plotted, your layout should look similar to the one shown in Figure 59.
This layout shows the ideal ED set up with a dual ring main, dual branch lines, and dual cap-ins at each magazine.
This ED set up for ASP 109 assumes that you will have all of the personnel, explosives, and time you will need
for this ED operation. You may have to do the job with a lot less, but with sound planning, realistic training, and
a good SOP, you should be able to accomplish your assigned ED mission.
Figure 59. ASP 109 dual primed for ED.