LESSON 2
PRACTICE EXERCISE
PERFORMANCE (HANDS-ON WITH EQUIPMENT)
L02:
AN/UXC-7 Installation/Preventive Maintenance Checks and Services (PMCS)
TASK:
Installation/PMCS.
CONDITIONS:
Given an AN/UXC-7, handtools, TM 11-5815-615-10, TM 11-
5815-615-23, vehicle mounting adapter, selected vehicle,
interconnecting cables appropriate for mode/type of operation as
described in Table 3, interface equipment appropriate for
mode/type of operation described in Table 4, a predetermined site,
using realistic tactical scenario narrations and discussions, and
monitored by a qualified OJT supervisor.
STANDARDS:
Correctly install the AN/UXC-7 at a fixed site and in a vehicle,
performing interconnection procedures for one of the options listed
in TM 11-5815-615-10, paragraph 2-5, within 20 minutes per
installation IAW TM 11-5815-615-10. Perform PMCS within 20
minutes IAW TM 11-5815-615-10 and TM 11-5815-615-23, and
perform installation procedures for Mode A or Mode B self-test
operation within 20 minutes IAW TM 11-5815-615-10.
Performance will be under a simulated test in a tactical scenario
environmental condition.
INSTRUCTIONS:
When you feel you are ready to perform the performance (hands-
on with equipment) practice exercise for this lesson, inform your
SOJT monitor. You are reminded not to attempt to perform the
above task without the assistance of an individual SOJT monitor.
46