6.
Finding of "No Agreement" on an audit may result in a recommendation
from AMC that the laboratory cease
a.
b.
all calibration.
c.
to calibrate TMDE, but continue to calibrate transfer standards.
7.
What is the usual period of time necessary for equipment to reach
ambient temperature after being brought into the laboratory?
a.
30 minutes
b.
6 hours
c.
24 hours
8.
The publication that governs frequency traceability is
a.
TB 750-117.
b.
TB 750-115.
c.
TB 750-25.
9.
The facilities engineers evaluate the grounding system every
a.
12 months.
b.
6 months.
c.
as requested.
10.
Who is responsible for making lighting surveys in the laboratory?
a.
Post engineer
b.
Laboratory chief
c.
Technical supply and repair section
11.
When establishing a calibration company area, which element of the
company receives primary consideration as to location and use of
available facilities?
a.
HQ and QA section
b.
Laboratory
c.
Transfer platoon
88