12.
The data obtained from a visual inspection or a intercomparison check
will be recorded
a.
above the signature block on the calibration report.
b.
in the lab log book.
c.
on the back of the calibration report.
13.
Who calibrates and establishes
the
recall
schedule
for
secondary
a.
USASL
b.
AACL
c.
AACT
14.
How is the Army's volt transferred to a secondary reference facility?
a.
By a transfer standard from NBS.
b.
By a transport standard from the USASL.
c.
By transporting the facility's standard cells to the USASL for
calibration.
15.
When is
the
laboratory
temperature
and
humidity
recording
system
checked?
a.
At the start of each week.
b.
At the end of each week.
c.
16.
How often is a calibration facility audited?
a.
Every 120 days
b.
Semi-annually
c.
Annually
17.
There must be two persons in the immediate work area when
a.
work is being performed on circuits carrying over 30 volts.
b.
you are standardizing a micro potentiometer.
c.
performing surveillance on the reference and working groups of
standard cells.
89