LESSON 1
ANSWER KEY AND FEEDBACK
Item
Correct Answer and Feedback
1.
C. DA Form 2415. (page 1-2, para 2)
2.
C. 300 feet. (page 1-8, paras 2)
3.
B. Detonation. (page 1-15, pars 2)
4.
C. TM 9-1300-206. (page 1-13, para 3)
5.
D. Local EOD teams. (page 1-6, para 6)
6.
B. EOD personnel. (page 1-2, para 1)
7.
B. Upon receipt of an approved DA Form 2415. (page 1-6, para 1)
8.
C. ACC-H. (page 1-2, paras 6)
9.
C. Downwind from inhabited areas. (page 1-10, para 1)
10.
D. To be sure demolition personnel are thoroughly trained and briefed on each operation. (page 1-6,
para 5)
11.
A. AT mines. (page 1-22, para 6)
12.
B. TNT. (page 1-18, para 10)
13.
D. SB 708-4. (page 1-12, para 4)
14.
C. TM 9-1300-206. (page 1-13, para 3)
15.
B. As few as possible, but not less than two. (page 1-8, para 5)
16.
A. Priority 1. (page 1-21, para 5)
17.
C. Category E. (page 1-22, para 4)
18.
B. M7 nonelectric blasting cap. (page 1-27, para 2)
19.
C. Three feet. (page 1-26, para 1)
20.
C. 30 minutes plus the expected time for detonation. (page 1-27, para 7)
21.
D. One-eighth to one-quarter inch from the open end. (page 1-27, para 6)
22.
C. M51 and galvanometer. (page 1-28, paras 3 and 4)
23.
A. M1A4 priming adapter. (page 1-34, para 3)
24.
B. M118 and M186 demolition charges. (page 1-36, para 2)
25.
C. 18 inches. (page 1-37, para 2)
26.
D. Girth hitch with one extra turn. (page 1-39, para 3)
MM0170
1-50