MM3671, Lesson 2
Figure 2-23. Locking and Sealing Doors.
The placarding of the MILVAN must be checked for correctness, according to the requirements of BOE-6000.
Placards must be properly affixed to both sides and to the front and rear of the container while being loaded.
Notify the shipping section of the ASP for correction if placarding is incorrect.
When you are satisfied that the load is authorized, properly secured, and placarded, put the number of the
MILVAN and your signature on the MILVAN Certificate (figure 2-4), releasing the loaded MILVAN for shipment.
File your inspection check list and report in the surveillance section.
27