MM3671, Lesson 2
REVIEW EXERCISES
Circle the letter of the correct answer to each question.
1. What reference contains MILVAN container rejection criteria?
a. DA Pam 310-3.
b. MIL-HDBK 138 (AR).
c. BOE-6000.
d. TM 385-1.
2. What is done if a MILVAN container defect is not corrected on the spot during an inspection?
a. A warning is issued.
b. The inspector comes back and inspects only that one defect.
c. The container is rejected.
d. A conditional acceptance is issued.
3. What part of an unloaded MILVAN is inspected first during an inspection?
a. The roof.
b. The coupling device.
c. The interior.
d. The exterior doors.
4. What is being checked when the inspector gets in the MILVAN container and closes the doors?
a. The level of light.
b. The ventilating system.
c. Light penetration.
d. The braces.
5. What of the following defects is acceptable for a MILVAN container's interior sides and front wall?
a. Small dents.
b. Holes on the sides.
c. Cracked welds.
d. Distorted top rail.
28