The SOP Operator's Statement will be placed directly beneath the cover sheet and will have a format similar to
that shown in figure 1-4. Each operator will be required to sign this statement when the following events occur.
1. When he is first assigned to the operation.
2. When an approved formal or interim change is made to the SOP.
3. When an operation is started up after 6 months or more in an inactive status.
4. At least once per year.
The fourth element of the SOP that must be prepared will be the Index of Operations (See Figure 1-5).
Figure 1-5. Sample Index of Operations.
8
MM4676