Home
Download PDF
Order CD-ROM
Order in Print
Home
>
Munitions Reference and Training Manuals
>
> Level the AN/FPN-40 radar set group.
Locate the Jam nuts on the cross arm spirit level.
Place SCAN switch (S4201) to the ON position (Figure 9).
Level Radar, Adjust Power Supply and Center Current, and Synchronize
Page Navigation
11
12
13
14
15
16
17
18
19
20
21
3.
Level the
AN/FPN-40
radar set group.
a. Place
LOCAL/REMOTE
switch (S4201) to the
LOCAL
position (Figure 13).
Figure 13.
Control monitor C-2124A/FPN-33.
b. Depress the HV OFF button on
power supply
PP-2489/FPN
(Figure 8).
13